Jordan Foster Construction

menu»

Projects - Infrastructure

East Bridge Loop 375

El Paso, TX | Infrastructure
East Bridge Loop 375 - Jordan Foster Construction
Client:
Texas Department of Transportation (East)
Project Size:
2.7 miles; 4-lane highway; 2 bridge structures

CF Jordan Construction (now Jordan Foster) performed as general contractor with construction of two bridge structures; main lanes consisting of grading 900,000 cubic yards of embankment, asphaltic concrete pavement, concrete pavement continuously reinforced, retaining walls, bridge structures, storm sewers, overhead sign bridges, traffic management system, illumination, traffic signals, signing, striping, delineation and landscaping.